What is the Praveg OPTIC Maturity Model?
A practitioner-derived organisational maturity model with five pillars (Organisation & People, Process, Technology, Improvement, Context), twenty-five dimensions and a thirty-five-item diagnostic. Every rating is read against a Target Maturity Profile calibrated to the organisation, not against a universal five. It is part of PBAS™, the Praveg Business Acceleration System.
Who is OPTIC MM designed for?
Mid-market organisations of 50 to 500 people, often founder-led, in or adjacent to regulated industries: project-driven firms, pharmaceutical and clinical research organisations, growing professional services firms and organisations in transformation.
How is OPTIC different from other maturity models?
Three things. It calibrates a target before it scores, so level five is not the goal. It never averages: a pillar's level is the median of its dimensions with the limiting dimension named, and a red flag caps a pillar at two. And it decides where to start with a written rule, the Priority Lens, rather than a judgement call.
What is the difference between OPTIC Rapid and OPTIC Deep?
OPTIC Rapid is self-rated by the leadership team in half a day on the twenty-five ladders and produces a provisional radar and lead-pillar hypothesis. OPTIC Deep is evidenced, multi-assessor, 2 to 4 weeks, uses all thirty-five items under the five scoring rules and produces pillar and dimension radars, limiting dimensions and a scored Priority Lens. A Rapid result is never presented with the authority of a Deep result.
What is the Priority Score?
Priority Score = (Gap × Impact) + Dependency, each rated 0 to 3. The highest score leads; ties go to the pillar further upstream. Support pillars are worked to an enabling floor, low-score pillars are stabilised, and pillars above target are simplified in cycle two.
Is OPTIC validated?
OPTIC is practitioner-derived. Its evidentiary status is stated openly: the instrument has not yet been through formal psychometric validation, the calibration drivers are structured judgement rather than derived weights, and a validation roadmap is in progress through the assessment platform.
How long does an OPTIC engagement take?
Discovery and Diagnostic runs weeks 1 to 4, Intervention Design weeks 3 to 8, Implementation Partnership months 2 to 9 and Transition and Sustain months 7 to 12. Praveg stays through implementation: an Outcome Model, not a Recommendation Model.